How to erect the crane reasonably and correctly?

As the main equipment for carrying and lifting heavy objects in various places, cranes are widely used, bringing a lot of convenience to everyone in construction. But it needs to be erected before it can be used, so how should the crane be erected reasonably and correctly? Next, I will take you to learn more about it.

  1. Set up the mast in the middle of the main beam of the crane, and slightly close to the side of the heavier main beam, so that the lifting equipment will not tilt, and the electric hoist is firmly tied to the main beam and lifted at the same time.

2. When the crane is hoisted, it should keep rising stably, and it should not swing at will. In order to enable people to control it, ropes can be tied to both ends of the equipment.

3. Use the hoist and mast to pass the rope into the hoisting hole to lift.

4. Lift the equipment to an appropriate height, bolt the control room to the connecting frame and the connecting seat, and then weld the connecting seat to the main beam and the cross beam according to the attached drawings.

5. When hoisting the equipment to over the track, pull the rope to twist, and gradually fall down so that the crane wheel groove is aligned with the track.

The erection of a crane is an important task, and the quality of the erection will directly affect the subsequent use of the equipment. Therefore, we should make reasonable assumptions for it in accordance with the above process.